← All Logsheets
Crane & Derrick
Daily Inspection Log
NYC BC §3318 · 1 RCNY §3319-01 · OSHA 29 CFR 1926.1412 · DOB Operator License Required
PL-004
Project Address
General Contractor DOB Job No.
Crane ID / Serial No. DOB Crane Permit No.
Crane Make & Model Rated Capacity (tons)
Operator Name DOB Operator License No.
SSM Name SSM License No.
Month / Year

KEY:   P = Pass   F = Fail   N/A = Not Applicable  |  All failures must be corrected before crane operations commence. Record corrective action in notes column.

# Inspection Item MonTueWedThuFriSatSun
PRE-OPERATION WALK-AROUND — BC §3318 / OSHA 1926.1412
1Main structural members, connections, and pins — no cracks, distortion, or deformation
2Wire rope on all drums inspected — free of kinking, broken or worn wires, corrosion, and rope distortion
3All sheaves and pulleys in serviceable condition — groove profile correct and guards in place per manufacturer spec
4Crane hooks examined — free of cracks or distortion; safety latch present and operating correctly
5Load line reeving and overhaul ball in serviceable condition — no excessive wear or damage
6Boom chord members, lacings, and suspension pendants undamaged — all clevis pins retained with cotter keys
7Access walkways, ladders, and platforms in place and properly secured
8Support surface bearing capacity assessed — outrigger or crawler pad arrangement confirmed for planned loads
9Safe approach distance to overhead power lines confirmed — OSHA 1926.1408
OPERATIONAL SYSTEMS — OSHA 1926.1416
10All controls labeled, operational, and return-to-neutral tested
11Boom angle indicator functional and accurate
12Load moment indicator (LMI) / rated capacity limiter tested and operational
13Anti-two-block device tested and functional
14Swing, hoist, and travel brakes tested — no slippage under load
15Horn, warning alarms, and emergency stop functional
MECHANICAL & FLUID SYSTEMS
16Engine oil, hydraulic fluid, and coolant levels within acceptable range
17No visible fuel, hydraulic, or coolant leaks
18Swing gear, turntable, and bearing lubricated per manufacturer schedule
19All wire rope terminations (wedge sockets, spelter sockets) fully secure
20Operator cab clean and orderly — walkways and controls area free of slip/trip hazards; fire extinguisher mounted and charged
Operator Signature
Notes / Deficiencies & Corrective Actions
SSM Name (print) SSM License No.
SSM SignatureDate