| Permit # |
| Name of Scaffold Erector / Installer | Installation Date | Permit Expiration Date |
| Renter / Responsible Party Name | Contact Phone # |
| Shed Type Light Duty Medium Duty Heavy Duty | Approved drawings on site and available for inspection? Y N N/A |
|
| Number of platforms docked Y N N/A | Base plates and mudsills are secured Y N N/A |
| Required signs are posted on parapets Y N N/A | Scaffold pins and bolts are fully installed Y N N/A |
|
| Cross braces are fully attached, not bent, and none are missing Y N N/A | Legs and poles are plumb, properly braced, and not displaced Y N N/A |
| Tie-ins are correctly spaced, properly secured, and sufficient in quantity Y N N/A | Pipe clamps are tight and secure Y N N/A |
| Window jacks are tight and properly installed Y N N/A | All planks are secured and properly fastened Y N N/A |
| Decking and planks are in good condition with no defects Y N N/A | Deck is fully planked with no gaps or open spaces Y N N/A |
| Guardrails and toe boards are secured at all required locations Y N N/A | Safety netting is extended to full required length and height Y N N/A |
| Safety netting is properly secured Y N N/A | Parapet is at the proper height and secured Y N N/A |
| Lighting is operational and working Y N N/A | Deck is clean and free of debris and tripping hazards Y N N/A |
|
|
| Inspector Name (Print) | Signature | Date |